Skip to content

Louisiana enacts data center moratorium by...?

Polymarket prediction market· Same prices, rules and result

OPEN2 levels openResearch 13d ago

Polymarket chance · the 2 levels nearest 50%

June 30, 2027 11%December 31, 2026 3%

Each level is its own Yes or No; they don't add to 100%. Levels are in price order, as on Polymarket.

2 levels open · in level order

Option24hAI analystsTiers 1–2Buy
December 31, 20263%—2%none
June 30, 202711%−1.0 pts7%none

2 open levels, in level order. +2 more on Polymarket

AI analysts

4 AI analysts · each gives every option a chance · updated 13d ago
OptionMarketAI averageAIGap
December 31, 20263%2%−1
June 30, 202711%7%−4

AI analysts' average · June 30, 2027

7%

4 pts below the market · 4 AI analysts

Track record

Each AI analyst's odds and reason for every option are in Plus. The Free preview shows the averages and the gaps.

The AI analysts are Kellian's own agents and trade the markets they rate, with play money. Past performance is not indicative of future results.

News

Headlines link to the publisher. Kellian shows titles only.

Polymarket's traders in this topic by 3-month profit · updated 1h ago
OptionYes holdersNo holdersYes · No

2 options: no ranked trader holds them

Best-ranked first. Tier 1 ranks 1–10, Tier 2 ranks 11–50.

See all of them, their size, average entry, when most of their shares came in, and every move.

Past performance is not indicative of future results.

Rules

Show rulesHide rules
In plain English
Yes if Louisiana enacts, by 2027-06-30 11:59 PM ET, a statute or constitutional provision that mandatorily imposes a statewide moratorium on new data centers, or on all those above 100 MW. Tax-incentive suspensions, local moratoria and executive or agency orders do not count.
Resolution criteria
This market will resolve to "Yes" if the State of Louisiana enacts a law or constitutional provision that establishes a statewide moratorium on new data centers between market creation and the specified date, 11:59 PM ET. Otherwise, this market will resolve to "No". A statewide moratorium on new data centers refers to a binding policy with legal force that generally prohibits or suspends the approval, permitting, construction, grid interconnection, or operation of all new data centers, or a subset of data centers that includes all new data centers with an interconnection capacity above 100 MW per facility (requested or nameplate), throughout the state. Suspensions of tax incentives, exemption certifications, or economic development awards alone will not qualify, nor will a moratorium adopted by a local government or limited to part of the state. Specific exemptions (e.g., for specified applications, executed agreements, or interconnection requests) do not prevent a measure from generally applying to all new data centers, or a qualifying subset of new data centers, provided that data center approval, permitting, construction, grid interconnection, or operation is prohibited by default, rather than permitted subject to conditions or restrictions. Conditions on the resumption or termination of a suspension do not make a measure one that permits subject to conditions; a measure that suspends approvals, permitting, construction, or interconnection until a specified condition is satisfied qualifies. Enactment occurs when a bill becomes law under the state's constitution and laws, whether by gubernatorial signature, veto override, becoming law without signature, approval at a statewide referendum election, or any other legal mechanism by which statutes can be enacted. For an initiated or referred statute or constitutional amendment, or other voter referendum, the relevant law is considered to have been enacted on the election day on which it was approved, as reflected in the certified results, regardless of when the measure is certified or takes effect. Passage by one or both chambers, or a Governor's announced intent to sign, is not enactment. Executive orders, agency orders, and other measures which are not statutory or constitutional do not qualify as enactment regardless of legal force. A provision removed by line-item veto is not enacted unless the veto is overridden as to that item. The operative text of the measure at enactment controls; provisions amended out before enactment do not qualify. The moratorium provision must be mandatory on its face. A statute that merely authorizes a state agency or the Governor to impose a moratorium at their discretion does not qualify. A statute that directs suspension of approvals or interconnection upon a specified condition qualifies only if the condition is objectively determinable and is not deferred to be determined by the implementing agency's findings, certifications, or completion of its own proceedings. This market resolves based on the date of enactment, not the effective date. Resolution will not be affected by failure to implement a law, judicial invalidation, repeal, or expiry that follows a relevant enactment, or an effective date that comes after the date of enactment. The primary resolution source will be official information from the state government of Louisiana; however, a consensus of credible reporting may also be used.
How markets resolve
Sign in to comment